Environmental restoration is process of repairing damaged ecosystems

Our Project


800.7 hectares in the Kharganat River basin in Yeroo soum of Selenge province.

Damaged and abandoned due to mining for several years” in Section 5.1.8 of the 2020-2024 Action Program of the Government of Mongolia for 2022-2023

777.6 hectares of land in the area of ​​Nariny Am 2023-2024

Restoring 8,000 hectares of land damaged and abandoned due to mining for many years” in Section 5.1.8 of the 2020-2024 Action Program of the Government of Mongolia for 2023-2024

Project progress

800.7 hectares in the Kharganat River, 777.6 hectares of land in the area of ​​Nariny Am, rehabilitation work total of 1578.3 hectares located in Selenge province and Yeroo soum.

Railway project one of the 14 mega projects of the Mongolian government.

Construction of a 102 km railway line between Bagahangai and Khushigti Valley,

NEWS

PDAC 2024: JINJII MINING LLC collaborates with Canadian Company

Jinjii Mining LLC Signs Memorandum with Canadian Companies at PDAC-2025

Restoration of 10,000 hectares of land damaged by mining

Eagle TV news Selenge province Yeroo soum

Erdenet today news

Rehabilitation 2024

Bloomberg TV Mongolia




Shantui SD22
Weight23.4 t
Revolutions at max torque1800 rpm
Soil pressure7.85 kg/cm²
Engine power162 kW
CATD6G2
Operating Weight (LGP)17 500 kg
Revolutions at max torque1,900 rpm
Operating Weight (XL)16 880 kg
Net Power160 hp
CATD6R
Operating Weight – STD18 325 kg
Operating Weight – XL20 080 kg
Operating Weight – STD21 715 kg
Net Power130 kW
Doosan DX300LCA
Operational Weight29,600 kg
Bucket Capacity (SAE/PCSA)0.64 ~ 1.75 m3
Engine Power151 kW
Max reach10.55 m
Doosan DX520LCA
Max. Reach horizontal10.46 m
Bucket capacity3.28 m³
Revolutions at max torque1300 rpm
Engine power238 kW
Hyundai R520LC-9
Max. Reach horizontal16.2 m
Bucket capacity3.2 m³
Revolutions at max torque1800 rpm
Engine power277 kW
Doosan SD300N
Engine power162 kW
Lifting force160 kN
Bucket capacity max4 m³
Travel speed38.4 km/h
Камаз
Max. Reach horizontal
Bucket capacity10940л
Revolutions at max torque
Engine power
Зил-131
Max. Reach horizontal
Capacity5 tons
Revolutions at max torque
Engine power
Doosan DX1000
Engine power469 kW (629 hp) @ 2000 rpm
Maximum Swing Torque31,850 kgf·m
Bucket capacity max5.4 – 6.8 m³
Operating weight97,000 – 99,500kg
Doosan DX800
Operating Weight79.1 tons
Transport Length13.17 m
Transport Width3.56 m
Engine power470 kW / 2,100 rpm (SAE J1349, net)
САТ374 Excavator
Operating Weight156819lb
Swing Speed6.4rpm
Swing Torque158428lb ft
Engine power476hp
САТ140 GRADER
Net Power (Maximum)275-hp
Operating Weight – Standard (SU)17.5 tons
Operating Weight – Standard (U)
Engine Speed at Rated Power2000 RPM
CATD8R
Net Power (Maximum)239 kW 320 hp
Operating Weight – Standard (SU)37 557 kg
Operating Weight – Standard (U)38 192 kg
Operating Weight – LGP (SU)35 562 kg

When carrying out technical rehabilitation work, it is recommended to comply with relevant environmental laws in force in Mongolia, approved technical rehabilitation methods, and Mongolian standards. These include:

1. “Methodology for technical and biological rehabilitation of land damaged by mining activities”, approved by the Order No. A-138 of the Minister of Environment, Green Development and Tourism of 2015

2. MNS 5915-2008, Environment. Classification of land disturbed by mining activities.

3. MNS 5917-2008, Environment. Rehabilitation of land damaged by mining activities. General technical requirements.

4. MNS 4919-2000, Environment. Soil for paving in disturbed areas. Technical requirements.